SLVAFR4 February   2024 TPS25762-Q1 , TPS25772-Q1

 

  1.   1
  2.   Abstract
  3.   Trademarks
  4. 1Introduction
  5. 2Vendor Information File (VIF) Setting
    1. 2.1 Automatic VIF Generation
    2. 2.2 Generate VIF Manually
  6. 3Power Delivery Compliance Test
    1. 3.1 Basic Software for Compliance Test and Results Analysis
  7. 4Power Delivery Source Power Requirements Test
    1. 4.1 SPT.1 Load Test and SPT.2 Capabilities Test
    2. 4.2 SPT.3 Hard Reset Test
    3. 4.3 SPT.5 Over Current Test
    4. 4.4 SPT.6 PPS Voltage Step Test
    5. 4.5 SPT.7 PPS Current Limit Test
  8. 5Analysis of Some Failure Examples
  9. 6Summary
  10. 7References
Application Note

TPS257xx-Q1 Pass Compliance and QuadraMAX Best Practice