SLVAFR4
February 2024
TPS25762-Q1
,
TPS25772-Q1
1
Abstract
Trademarks
1
Introduction
2
Vendor Information File (VIF) Setting
2.1
Automatic VIF Generation
2.2
Generate VIF Manually
3
Power Delivery Compliance Test
3.1
Basic Software for Compliance Test and Results Analysis
4
Power Delivery Source Power Requirements Test
4.1
SPT.1 Load Test and SPT.2 Capabilities Test
4.2
SPT.3 Hard Reset Test
4.3
SPT.5 Over Current Test
4.4
SPT.6 PPS Voltage Step Test
4.5
SPT.7 PPS Current Limit Test
5
Analysis of Some Failure Examples
6
Summary
7
References
Application Note
TPS257xx-Q1 Pass Compliance and QuadraMAX Best Practice